Sept 6, 2026 Visit to Fire Tower Site to check progress

(Photos & Videos ©2026 Robert Cummings)

Activity continues at the Fire Tower site as section 3 – the section to the left in the photo of all three sections – is further assembled along with the stairs, railings, and treads.

Much of the activity is happening offsite in the metal shop fabricating and galvanizing new parts for the tower.

Once the third section is complete it will be hoisted atop the portion already set on the foundation.