Tag: news

  • November 5th Update

    A visit today to the fire tower site while setting the course for the Raven Rocks Run (trail race date: Nov 8th) showed some progress and workers on site prepping for some big strides next week.

    The fire tower sections are prepped to be assembled together — and they are expecting the CRANE next week to enable the hoisting of “section 3” (aka ‘the middle’) on top of “section 1 & 2” (aka ‘the base’). After that goes well they will get “section 4 & 5” (aka ‘the top’) placed atop sections 1, 2 , & 3.

    Once fully assembled, the Cross River Mountain Fire Tower will stand at 100′ high on the exact USGS marker location of the former fire tower (which stood at 60′ high) at this spot.

    (Photos & Videos ©2026 Robert Cummings)

    (Photos & Videos ©2026 Robert Cummings)

  • August 2026 Cross River Mountain Fire Tower Update

    The fire tower has been seeing progress since our last June update.

    Photo updates:

    The contractors assembled a wooden scaffolding on top of each section to assist in joining the sections together.

    Most recently, section 2 was moved up via crane atop section 1 (the base, which has been anchored to the foundations since November 2025). This structure is now approximately 40′ high.

    The stairs, railings, and transition platforms between stair sections are complete in these sections.

    In addition, section 5 (the canopy section with the cabin and roof) has been placed on top of section 4 with the help of a wooden scaffolding for safety and ease of working at the joining spots.

    This means the work area, which formerly had 4 separate sections of 20′ each now has 2 sections of 40′ each after the combining was finished.

    This frees up room on the ground to assemble the middle section – section 3 – which didn’t have enough room in the construction area to be assembled before the combination of section 1 and section 2.

    The parts for section 3 have been on-site since 2025 but they were awaiting this moment to get assembled.

    Once section 3 is assembled (including stairs, railings, and landings) the big crane will be positioned at the site and it will be lifted atop the foundation sections (section 1 & 2 combined). Shortly after that, the top sections (4 & 5) will be hoisted atop to complete the fire tower.

    There are still ground-level items needed before the tower will be officially opened. These include the security fence and the stair cage shown in the concept video. (concept video is here: https://crmfiretower.org/videos/ at about the 2 minute point of the third video listed). Below is a screen shot:

    screen shot of concept video showing lower stair cage and security fencing – video source is third video on this page https://crmfiretower.org/videos/

    More updates to come as progress is made!

    Thank you for your support. Through the Fire Tower Trail Half Marathon & 10k in June we raised over $1,500 in three months from supporters via the Friends of the Fire Tower 501c3.

    These funds will go towards educational and accessible exhibits to supplement the tower when it is open. One of the accessible programs we have proposed is a 360° virtual fire tower experience with custom seasonal panoramic views taken from atop our fire tower and available online and also using VR goggles at the Trailside Museum in the park.

    If you’d like to contribute to this fundraising, donations are open through this link: https://runsignup.com/Race/Donate/NY/CrossRiver/FireTowerRaces.

    We have a new goal of raising $5,000 from now through June 2027 by the NEXT Fire Tower Trail Half Marathon & 10k. We hope you can support us reaching that goal!

  • Race Day 2026 Is Here!

    Welcome to the 1st Annual Fire Tower Trail Races at Ward Pound Ridge Reservation!

    RESULTS

    Logistics

    YES! there will be same day registration – opens 7:00am

    Directions & Park Map & Course Map

    Photos • Upload Your Photos

    Update: ALL Results 

    And if you haven’t yet joined the Friends of The Fire Tower, you can do it now by clicking here

  • Site Visit March 26, 2026

    Visit to the Cross River Mountain Fire Tower site on Thursday, March 26, 2026 with Taro Ietaka (Ward Pound Ridge Reservation park superintendant), Erika Pierce (Westchester District 2 Legislator), Tom Cohn (Fire Tower volunteer), and Rob Cummings (Fire Tower Volunteer) to check the progress for the project which was recently restarted after the long cold snowy winter atop the mountain.

    Four of the five fire tower sections have been assembled. The builders are awaiting the stair risers and treads to install before they can stack them up one by one with a crane (to be delivered when needed).

    The fire tower project is expected to be complete during 2026, but the exact date depends on the number of pieces that need to be fabricated for this historic tower.

    The county also recently approved a race to raise money for the fire tower: the Fire Tower Half Marathon & 10k Trail Races at Ward Pound Ridge Reservation on June 7, 2026. Registration for both distances is open now at runsignup.com/firetowerraces.

    Photos by Rob Cummings

  • Fire Tower Update – The Recorder Newspaper article Jan 2, 2026

    By THANE GRAUEL

    Original article here: https://www.therecorder.org/post/ward-pound-ridge-fire-tower-construction-progresses

    Photos by Robert Cummings

    Like much of the wildlife and vegetation at Ward Pound Ridge Reservation, work on a new fire tower atop the park’s highest peak has slowed for the season.

    Work was progressing rapidly in the fall on preparations to erect a new tower off the Blue Trail, where a 60-foot fire tower had been placed a century ago. The original was decommissioned in 1971, and eventually dismantled in 1982.

    “Three sections of the tower are now assembled at the final work site, although they will not be lifted into position by a crane until additional construction work is done,” Park Superintendent Taro Ietaka told The Recorder in December.

    “At the moment waiting for the cement at base to cure,” Ietaka said. “Some metal elements will need to be fabricated so that will take a few weeks. Will be dependent on weather as well — we are not able to plow/salt to that location so work will need to pause if there is snow or ice.”

    The tower’s location at the top of what’s called Cross River Mountain on old maps. The original tower allowed views of up to 100 miles on a clear day, including Long Island, the Hudson Valley, the Catskills and the Appalachian Mountains.

    The summit is about a mile’s hike from the parking on Pell Hill. Ieteka said the tower should be completed sometime this year. An event to mark the occasion will be announced.

  • Site Prep and Pre-assembly underway

    Story and Photos by Robert Cummings

    The latest news with the Fire Tower construction:

    • Blue trail grading to enable trucks and crane access to site
    • Construction fence around fire tower site including bump-out for assembly, storage, and crane
    • Re-routing the Blue Trail around the construction site
    • Pre-assembly of the fire tower parts to make sure all components are there and everything fits

    Photos of these items are below:

    Please let us know your thoughts! Contact us.

  • Fire Tower Article – November 29, 2024

    By Robert J. Cummings

    Last week, the disassembled pieces of the fire tower were delivered to the park in anticipation of the final construction push getting underway. Erika Pierce, County Legislator for District 2 said “we are putting together a community informational meeting for those interested in learning more about the restoration.” Erika, and her predecessor Kitley Covill, have been long-time advocates for the project.

    This means the restoration of the fire tower to the highest point in Ward Pound Ridge Reservation, named on old maps as “Cross River Mountain,” has moved into the final phase of design, engineering, and construction. The former fire tower was erected in 1926. It was decommissioned in 1971 but remained standing until 1982 when it was taken down.

    Regular hikers on the blue trail where the fire tower once stood have seen the preliminary trail grading and some track marks on the trail. A few weeks ago in late October 2024, there was an engineering team at the summit. The team transported a drilling rig to the site. They were getting core samples of the bedrock. This allows the builders to better understand foundation placement and how anchoring would work for the tower. The sampling work is now complete and some of the next steps include laying the foundation blocks that will hold the tower.

    One of the driving forces behind the fire tower restoration effort for the past fifteen years has been local Bedford resident Tom Cohn. Tom grew up in White Plains where he and his friends often drove to the northern Westchester park to visit and climb the Cross River Mountain Fire Tower before it was removed. “It felt like we were going to Canada. I was upset when it was taken down.” Tom has always thought the removal was misguided and he has made it his mission to get the tower back to its place atop the summit.

    Some details still need to be worked through. Construction financing, design, and final engineering are still underway. Deputy Parks Commissioner Peter Tartiaglia said one of the many items they have to work out is exactly how to get all of the parts to the summit of the mountain. “We don’t want to change the rustic nature of the trail, but there will be some trail grading and branch trimming” to clear the way and make it passable to the vehicles.

    The Cross River Mountain Fire Tower project will join a growing number of New York State fire towers that have been restored and have become popular public destinations. Some of these restored towers include the Upper Esopus Fire Tower in Mt Tremper, NY and the Ninham Mountain Fire Tower in Carmel, NY. The fire tower will be restored as faithfully as possible while adhering to current building and safety codes. Having other New York State fire tower restorations as templates has eased the process.

    Cross River Mountain, at 860 feet elevation, is the highest point in Ward Pound Ridge Reservation. It is accessible via the blue trail from Kimberly Bridge — or via a white connector trail from the Pell Hill campsites. The closest you can park a car to the tower site is three-quarters of a mile hike away. This means visitors will have to sweat a bit on whatever trail they take to get to the tower. The tower base elevation plus the 80’ tower puts the total elevation at around 940’ at the top.

    Once completed, the tower will offer a 360-degree view on a clear day of many visible points of interest including New York City, the Catskills, the Hudson Highlands, the Berkshires, Long Island Sound, plus the Whitestone, Throgs Neck, and George Washington bridges. There are also many smaller features and peaks that locals will be able to spot.

    It is not a small undertaking and it has been a cooperative effort between the Parks Department, the Department of Public Works, the Board of Legislators, and the County Executive’s office. Local towns have also been longtime supporters including support from the towns of Lewisboro, Pound Ridge, and Bedford which surround the park.

    In addition to the Fire Tower project coming to fruition, Ward Pound Ridge Reservation will be celebrating its 100th anniversary in 2025. There are many events planned for the centennial year including a 100-mile trail challenge, an event celebrating the park’s history in May 2025, and of course the hoped-for opening of the restored fire tower. The county can’t commit to a certain date, but the hope is to have it ready for the public in 2025.

    Why a fire tower? Tom Cohn has the answer “All anyone needs to do to understand this fire tower idea is to climb the tower, stand nearly 1000 feet above sea level, and look to the horizon – it will be beautiful.”

  • Fire Tower Article – November 1, 2019

    Tom Cohn grew up in White Plains. When he and his friends would drive up to Ward Pound Ridge Reservation for a hike, the favored destination was the Cross River Mountain Fire Tower. “It felt like we were going to Canada,” he told an audience at the WPA Gallery in the Park. “I was upset when it was taken down.” Tom, who lives in Bedford now, has been working and advocating for the last 9 years to try to get the fire tower put back up. His tireless efforts have paid off in the form of state and county funding that will – at long last – make the dream a reality.

    State Senator Peter Harckham addresses the crowd about the Cross River Mountain Fire Tower project and the funding he and others have secured at the state and county level. Behind him, left to right, is Westchester County Film and Tourism Director Natasha Caputo, Fire Tower evangelist Tom Cohn, County Executive George Latimer, and County Legislator Kitley Covill. Seated in the front row are Supervisors Kevin Hansen, Peter Parsons, and Chris Burdick from the towns of Pound Ridge, Lewisboro, and Bedford. Photo by Robert Cummings

    On Tuesday, October 29 at the WPA Gallery in the park, New York State Senator Peter Harckham announced a $100,000 state grant awarded for the purposes of reconstructing the historic Fire Tower at the park. He was joined by Westchester County Executive George Latimer and Westchester Legislator Kitley Covill, whose district includes Ward Pound Ridge Reservation. They announced a matching $100,000 grant from Westchester County earmarked for engineering and design for the project in conjunction with the state funding.

    Peter told a story about his first fire tower climb up in the Catskills. “When I climbed down, the ranger gave me a badge that said I was the youngest to climb that tower.” Years later he realized that might not have been entirely the case, but he treasures the memory. He wants to help re-create that magical feeling for a new generation of hikers and explorers. “The project will bring countless new visitors to Ward Pound Ridge Reservation and will serve as another economic benefit for the neighboring towns and for Westchester County. I definitely plan to be among the first visitors to enjoy the incredible panoramic views of the region from the new tower.”

    Supervisors from the surrounding towns of Lewisboro, Bedford, and Pound Ridge were in attendance as well and have been ardent supporters of the effort to bring the Fire Tower back. Peter Parsons, Lewisboro Town Supervisor and Chris Burdick, Bedford Town Supervisor wrote letters of support over five years ago backing the project. Pound Ridge Supervisor Kevin Hansen is also a supporter of the project and the Pound Ridge Town Board has written letters in support. Other supporters present included Lewisboro Town Historian Maureen Koehl along with Westchester Historical Society board member and Leatherman’s Loop founder Tony Godino. Both are enthusiastic supporters of the project. Tony said he was “happy for the park to have this for the kids and the people. And I congratulate Tom who has been so persistent in pursuing this dream, even when faced with obstacle after obstacle.” Other supporters include the Westchester Land Trust, Riverkeeper, the Lewisboro Land Trust, and the Bedford Historical Society.

    Parks Commissioner Kathleen O’Connor, who has been part of talks to bring back the fire tower for a long time, also spoke about the tower. “Anything that brings more people into the parks is welcome.” She acknowledged Jeff Main, the Ward Pound Ridge Reservation superintendent, as a bridge to the past. Jeff spoke about how he gave tours of the tower when he first joined the parks department as a new hire in the 1970s. He said after it was officially decommissioned in 1971, it remained open when a ranger was posted there. Gradually the tower deteriorated and was taken down in 1982. “People who experienced it have not forgotten it, but the newer folks in the area have no idea what they missed.” He is looking forward to the restoration and the reintroduction of the experience. Jeff noted there was a small stone caretaker’s cabin at the base of the tower which was demolished when the tower was removed. It is an open question whether the cabin will be incorporated into the restoration effort.

    The Cross River Mountain Fire Tower project will join a growing number of New York State fire towers that have been restored and are public destinations. Some of these restored towers include the Upper Esopus Fire Tower in Mt Tremper, NY and the Ninham Mountain Fire Tower in Carmel, NY. The fire tower will be restored as faithfully as possible while adhering to the updated building codes. Having other New York State fire tower restorations as templates will ease the process.

    Cross River Mountain, at 860 feet elevation, is the highest point in Ward Pound Ridge Reservation. It is accessible via the blue trail from Kimberly Bridge or via a white connector trail from the Pell Hill campsites. The closest you can park a car to the tower site is three-quarters of a mile hike away, so visitors will have to work a bit to get to the tower. The tower base elevation plus the 80’ tower puts the total elevation at around 940’ at the top, which is still a bit shy of the highest point in Westchester. That title belongs to Bailey Mountain in Mountain Lakes Park, standing at 982’ according to the USGS marker. Bailey Mountain will be one of the many that will be visible from the vista provided by the new fire tower. Other visible points of interest will be New York City, the Catskills, the Hudson Highlands, Long Island Sound, the Whitestone, Throgs Neck, and George Washington bridges, and many smaller features and peaks.

    One question asked of the County Executive Latimer and Senator Harckham was when the project will get started and when do they expect the project to finish. Since the grants are in the 2020 budgets, the initial design and engineering work would take place starting in January 2020 and would probably take about a year to complete. After then a second round of financing would be approved for the actual building of the foundation and tower which could take 6-12 months. Another question about possibly putting emergency services repeaters on the tower was going to be addressed in the design stage in accordance to restrictions on park use for that type of activity.

    For those questioning the need for a fire tower, which seems like a throwback to the past, Tom Cohn says “All anyone needs to do to understand this fire tower idea is to climb the tower, stand 1000 feet above sea level, and look to the horizon – it’s beautiful.”

    Replica of the Fire Tower commissioned by Tom Cohn five years ago to help generate interest and enthusiasm in the project. Photo by Robert Cummings

    Article written by Robert J. Cummings ©2019

  • New hurdles for fire tower project? (2018 article)

    ‘We want to build the fire tower to give people the opportunity to have an amazing destination in an amazing park.’

    — Tom Cohn, fire tower advocate

    By LUCIE COUILLARD

    After six years of effort, the construction of a fire tower at the Ward Pound Ridge might finally begin by the end of this year, said Tom Cohn, the former president of the Friends of the Trailside Museum.

    Mr. Cohn said recently that he plans to schedule a meeting with George Latimer, the county executive, and county legislators to determine if there are any additional requirements that the new administration has before building can begin.

    He noted that County Legislator Kitley Covill has expressed support for the fire tower project in the past.

    Last year, Mr. Cohn said, he focused on identifying and understanding the requirements on the part of Westchester authorities for building a fire tower in the Ward Pound Ridge. These include the tower’s dimensions and safety measures to prevent falls.

    “We can easily be compliant, and will be compliant, with New York State building requirements,” Mr. Cohn, who lives in Bedford Corners, said. He added that understanding these conditions “took some time.”

    Getting to this point meant answering the county board legislators’ questions about the tower on such topics as safety, building code and community support for the project.

    However, he cautioned, the new county administration might have other concerns or requirements that need to be addressed before he can move forward, Mr. Cohn said.

    After Mr. Cohn meets with county officials, he believes he can start engaging with the public to fundraise. Mr. Cohn added a modest amount of money has already been donated for the project, however, once the tower is

    approved, a new round of fundraising will be needed. 

    “This is something people would like to see done,” Mr. Cohn said.

    The original fire tower was built in 1926 and was operated by the Westchester County Park Commission until 1930, according to authors Beth Herr and Maureen Koehl in the “Ward Pound Ridge Reservation.”  Control of the tower was transferred to the New York State Conservation Department in 1931, where it remained for nearly 40 years. In 1971, the tower was decommissioned then torn down in 1982.

    Mr. Cohn became involved with the rebuilding project while serving with the Friends of the Trailside museum.

    The campaign to bring back the tower received broad support from representatives of all of the neighboring towns. However, the county’s concerns over compliance with safety and building codes kept stalling progress.

    Matters were further complicated when, during the early stages of the project, there were few similar projects that could serve as examples and provide officials with a level of comfort about their concerns. 

    That has changed. Recently there has been a resurgence of fire tower building projects throughout the country. In New York State alone, there are now more than 40 fire towers, including in the Catskills and Adirondacks regions, on both private and public properties, according to the New York Department of Environmental Conservation website. Mr. Cohn explained that the state has strongly backed this revitalization.

    The proposed fire tower in Ward Pound Ridge Reservation would be the only one in Westchester, at least under current plans. Supporters believe that it will become a destination for tourists and local visitors, and draw attention to the area, Mr. Cohn said.

    At a peak height of 60 to 80 feet, the tower would be 950 feet above sea level and afford hikers views of New York City, the Long Island Sound and the Hudson River.

    “We want to build the fire tower to give people the opportunity to have a amazing destination in an amazing park,” Mr. Cohn said.